The Hazard With No CFR Number Is Already Writing Citations: Heat and the General Duty Clause
OSHA's heat rule stalled. But the Heat NEP was reissued in April 2026 and the General Duty Clause still cites heat. The plan is a supply decision first.

Water Damage
Dry at the Surface, Wet at the Core: The Class 4 Loss Your Meter Signed Off Too Early
IICRC S500 Class 4 is bound water in hardwood, plaster, and concrete. A surface reading closes the job while the core of the assembly is still soaked.

Fire & Smoke
Ozone Doesn't Care Who's Home: The Deodorization Method That Becomes a Second Hazard
Ozone deodorizes only in an evacuated, sealed structure. Run it occupied and you have traded a smoke odor for an OSHA and EPA exposure problem.

Environmental
The Permit Was in the Binder, the Atmosphere Was Not: The Confined-Space Entry That Kills
OSHA 1910.146 does not care that the permit was filled out. A confined space is won by the calibrated gas monitor, the blower, and the retrieval rig.

Facilities
It Passed the Buff and Failed the Walk: The Floor Finish That Becomes a Slip-and-Fall Case
ANSI A326.3 sets a wet DCOF floor of 0.42. The mirror-shine finish that looked immaculate on Friday can miss it, and the slip-and-fall claim starts there.

Abatement
Dry Is a Violation: When Asbestos Removal Without Amended Water Becomes a Federal Case
NESHAP requires regulated asbestos material be kept adequately wet. A dry-stripped pipe is a documented federal violation, whatever the abatement plan says.

Biohazard / Trauma
The Decomp Clock: What Unattended-Death Jobs Cost When You Show Up On Time
You can disinfect a surface. You cannot disinfect what the fluid soaked into. Unattended-death jobs are won on porous source removal, not on how fast the truck rolled.

Construction
Table 1 Says Compliant. Your Silica Dust Says Otherwise.
The right diamond blade paired with an undersized HEPA extractor is still an OSHA 1926.1153 exposure. Table 1 is a system spec, not a shopping list, and most crews buy half of it.

Abatement
Pre-1978 and Unprepared: When a Repaint Becomes an EPA Lead Case
A scraper, a pre-1978 wall, and no RRP-certified firm on the ticket is not a paint job. It is lead-safe work-practice noncompliance with a federal penalty schedule attached.

Facilities
The Spray Bottle That Failed the Inspection: Facilities' Quietest OSHA Citation
Hazard Communication is perennially one of OSHA's most-cited standards, and the most common write-up is the most boring object on the cart: an unlabeled secondary container.

Construction
In Date Is Not Anchored: The Fall-Protection Gap That Still Passes the Walk-Through
The harness tag was current. The anchor was rated for the wrong load and the fall-clearance math left the worker hitting the deck before the lanyard locked. Subpart M does not grade on good intentions.

Biohazard / Trauma
The Dwell-Time Lie: Why "Hospital-Grade" Did Not Disinfect the Scene
An EPA-registered kill claim is a promise about contact time, not a sticker on the jug. If the surface dried in ninety seconds, the scene was never disinfected.