
TEXAS DATA CENTER CONSTRUCTION
The build has a critical path. Your supply chain shouldn't be on it.
Jobsite safety, containment, dust control, dehumidification, and final-clean supply for data center projects across Texas, staged in Grand Prairie at the center of the DFW corridor.
The Texas buildout, by the numbers
1 GW+
Installed data center supply in Dallas-Fort Worth, one of only three North American markets past a gigawatt.
CBRE, North America Data Center Trends H1 2025#1
Most attractive data center investment market in North America, named by 78% of surveyed investors.
CBRE, 2026 North American Data Center Investor Intentions Survey$500B
The Stargate AI infrastructure program, whose flagship campus went live first in Abilene, Texas.
CNBC, September 2025226 GW
Large-load capacity requests in the ERCOT interconnection queue, roughly three quarters of it data centers targeting 2030.
ERCOT System Planning Update, December 2025Texas is not having a data center moment, it is having a data center decade. Dallas-Fort Worth passed a gigawatt of installed data center supply in 2025, one of only three markets in North America over that line, and CBRE's 2026 investor survey ranks it the single most attractive data center market on the continent. West of the Metroplex, the $500 billion Stargate program put its flagship campus in Abilene. Behind all of it sits an ERCOT interconnection queue holding over two hundred gigawatts of large-load requests, most of it data centers trying to energize before 2030. Every one of those megawatts is a construction site first.
Data center schedules do not fail at the megaproject scale, they fail at the pallet scale. The commissioning date is set before the slab is poured, trades stack in overlapping phases, and the margin killer is not the labor rate, it is the idle hour: the silica-rated extractor that is at another job on cut day, the harness that is out of inspection at the 6 ft trigger height, the containment and walk-off matting that are not on site the week the fit-out goes to cleanliness protocol. Data centers then add a discipline most jobsites never see, a white-space phase where dust budgets and humidity targets look closer to a cleanroom than a construction site, and where the final clean is judged by a commissioning agent, not a walkthrough.
Stampede is a distributor, not a contractor. We do not compete with your crews, we make sure the gear is staged before the schedule needs it. Our Grand Prairie warehouse sits in the middle of the DFW data center corridor with same-day will-call pickup and next-day regional delivery, and we ship freight across Texas, to Abilene, Temple, San Antonio, and every campus in between. One PO covers OSHA 1926 PPE and fall protection, silica dust extraction, ZipWall containment, negative air and HEPA filtration, temporary dehumidification, final-clean chemistry, and the spill response stack, with a 24/7 line at 214.235.0721 for the day a live facility takes water it should not have.
The Corridor
Grand Prairie sits in the middle of it
Same-day will-call across the DFW corridor, scheduled freight to every campus in the state, and the interconnection queue that explains why the schedule matters.

Service
- Will-call and next-daySame-day will-call pickup from Grand Prairie and next-day delivery across the DFW corridor.
- Texas freightScheduled freight statewide, typically staged as phase-scale orders rather than piece-rate shipments.
- Grand PrairieStocking warehouse
- AbileneStargate flagship campus
- Temple
- San Antonio
- West TexasPermian Basin
Service coverage, not a delivery commitment. Your rep confirms dates and freight scheduling against the site and the order.
The ERCOT queue
- 226 GW
- Large loads seeking interconnection by 2030, against 63 GW in December 2024.
- 72.9%
- Of that queue is data centers, 164,191 MW of the total.
- +270%
- Growth in tracked large-load demand across the first eleven months of 2025.
ERCOT System Planning Update, December 2025Data as of November 18, 2025
The Lifecycle
One supply chain, three phases
From the first concrete cut to the day the facility goes live, and every year after.
Open Line
What you see is not what we carry.
This site publishes roughly seven hundred enriched SKUs. Stampede carries over a hundred manufacturer lines, and on every line we carry, the full catalog is orderable, not only the items we have photographed and written up. If it is not on the site, that is a publishing gap, not a supply gap.
Items we do not stock in Grand Prairie ship from the manufacturer. Lead time and minimums vary by line, and your rep confirms both before you commit.
PHASE 01
Build
Sitework through shell runs under OSHA 29 CFR 1926: Subpart M fall protection at the 6 ft trigger height, 1926.1153 Table 1 engineering controls on every concrete cut and core, HazCom on every trailer. Add a Texas summer on a shadeless pad and the supply list writes itself. This is the phase where our construction stack ships by the pallet, not the piece.

Silica Dust Control & Extraction
Husqvarna concrete cutting and coring equipment paired with Pullman Ermator HEPA dust extractors, sized to the 1926.1153 Table 1 engineering-control spec for the task, not the catalog page.
Fall Protection & Elevated Work
FallTech full-body harnesses, self-retracting lifelines, and anchors for the 6 ft trigger height, plus Louisville Ladder Type IA and IAA industrial ladders for shell and rack-steel work.
PPE & Heat Stress
Pyramex and 3M eye, head, hearing, and respiratory protection at crew scale, plus hydration and heat-illness supplies for slab pours and roof work in a Texas August.
Spill Response & HazCom
CEP Sorbents socks, pads, and spill kits staged at fueling and equipment lay-down areas, with secondary containment and the labeling stock HazCom inspections actually check.
Build phase starting list
Fall protection at the 6 ft trigger height, crew PPE for a shadeless Texas pad, respiratory protection for silica exposure, and the spill and HazCom stack for fueling and lay-down areas.
Fall Protection & Elevated Work
- 34001 FallTech 7016B Contractor HD full body harness
- 34006 FallTech 8240 6' shock absorbing lanyard, single leg
- 34007 FallTech 8240Y 6' shock absorbing lanyard, double leg
PPE & Heat Stress
- 32015 Pyramex SL Type 2 full brim hard hat
- 30099 Clear lens anti-fog safety glasses
- 31010 Pyramex DP1000 disposable earplugs, NRR 31 dB
- 33401 Class 2 reflective safety vest, lime green
- 33704 Pyramex ANSI A3 cut resistant gloves
Silica Dust Control & Extraction
- 30002 North 7700L half face respirator
- 30037 3M 2091 P100 particulate filter
Spill Response & HazCom
- 50005 K-Sorb CEP #22 cellulose absorbent, 20 lb bag
- 57004 Yellow caution barricade tape
A starting list, not a bill of materials. Quantities, sizes, and substitutions are set by your rep against your scope and site conditions.
PHASE 02
Fit-Out & Commissioning
The phase most suppliers get wrong. Once the envelope closes, the white space moves to cleanliness protocols with dust budgets and humidity targets a normal jobsite never sees. Containment goes up, negative air comes online, dehumidification holds the slab and the air ahead of rack delivery, and the final clean is judged by a commissioning agent with a particle counter, not a foreman with a flashlight.

Containment & Dust Barriers
ZipWall spring-loaded barrier systems, poly sheeting, Trimaco surface protection, and walk-off matting to hold the line between dirty trades and protocol space.
Negative Air & HEPA Filtration
NC Filtration negative air machines and Mastercraft HEPA vacuums, with the filter replacement program that keeps a months-long fit-out inside its dust budget.
Temporary Dehumidification
Phoenix and Legend Brands LGR and desiccant dehumidifiers for slab cure, coatings windows, and pre-rack humidity control, sized by grains per pound, not by guesswork.
Final Clean & Consumables
Commissioning-grade final-clean chemistry, microfiber, and floor care, the difference between a sign-off and a re-clean the week the racks are due.
Fit-out phase starting list
The white-space discipline stack: containment and barriers, negative air with HEPA filtration and its replacement filters, dehumidification for slab cure and pre-rack humidity targets, and final-clean consumables.
Containment & Dust Barriers
- 10621 6 mil flame retardant poly sheeting, 20' x 100'
- 53095 ZipWall SLP2 extension poles, 12'
- 53099 ZipWall AZ2 standard zipper, 2 pack
- 20108 Polyken 757 PE film tape, white
Negative Air & HEPA Filtration
- 90010 NCF Model 2000 negative air machine / air scrubber
- 91000 Dri-Eaz HEPA 700 air scrubber
- 40026 HEPA filter for the Dri-Eaz 700 air scrubber
- 40027 NCF MERV-8 pleated prefilter for the Dri-Eaz 700
- 90033 HEPAPro 13 gallon HEPA vacuum
Temporary Dehumidification
- 91007 Dri-Eaz Revolution LGR dehumidifier, 80 pints/day
- 91990 Phoenix D385 portable desiccant dehumidifier, 385 CFM
Final Clean & Consumables
- 52003 Blue huck towels, 8 lb bag
- 11000 Bioesque botanical disinfectant, RTU, 1 gal
A starting list, not a bill of materials. Quantities, sizes, and substitutions are set by your rep against your scope and site conditions.
PHASE 03
Operations
A live data center is a consumption-driven facilities account with a catastrophic edge case. Day to day it burns through MRO consumables, filtration, and janitorial chemistry on par cycles. And the day water shows up where water must never be, the response window is measured in minutes, which is exactly what the 24/7 CAT line is for.

Facilities MRO & Consumables
Floor care equipment, Unger window and restroom tool systems, Magnolia Brush lines, and the consumable chain on par-level reorder so the standing order never becomes the emergency.
Water Intrusion Response
Extractors, air movers, and LGR dehumidifiers stocked deep in Grand Prairie for the 3 AM call, with 24/7 CAT routing at 214.235.0721 for unscheduled warehouse pickup.
Air Quality & Filtration
True-HEPA vacuums and filtration consumables for plant rooms, air-handling spaces, and IAQ-sensitive support areas where particulate complaints become tickets.
Disinfectants & Janitorial Chemistry
EPA-registered disinfectants including Bioesque botanical lines for green-program facilities, plus the boring SKUs, liners, wipes, and paper, that keep an operations team out of retail aisles.
Operations starting list
The water intrusion stack worth staging before the 3 AM call, plus air quality, disinfectant, and the consumables a live facility burns on par cycles.
Water Intrusion Response
- 91007 Dri-Eaz Revolution LGR dehumidifier, 80 pints/day
- 91991 Phoenix Focus II dual axial air mover
- 90014 Legend Air low profile air mover
Air Quality & Filtration
- 91000 Dri-Eaz HEPA 700 air scrubber
- 90033 HEPAPro 13 gallon HEPA vacuum
- 40026 HEPA filter for the Dri-Eaz 700 air scrubber
Disinfectants & Janitorial Chemistry
- 11000 Bioesque botanical disinfectant, RTU, 1 gal
- 11012 Benefect Decon 30 botanical disinfectant, 1 gal
Facilities MRO & Consumables
- 52003 Blue huck towels, 8 lb bag
- 33602 Duraskin 6 mil black nitrile disposable gloves
A starting list, not a bill of materials. Quantities, sizes, and substitutions are set by your rep against your scope and site conditions.
Vendor Partners
Brands we stock for data center work
Direct lines, not jobber pricing.
Questions
Common questions
Can you supply data center projects outside the DFW Metroplex?
Yes. Same-day will-call pickup and next-day delivery cover the DFW corridor, and we ship freight across Texas, including the Abilene, Temple, San Antonio, and West Texas campuses. For remote sites we typically stage phase-scale orders, a full containment package or a full PPE crew load, on scheduled freight rather than piece-rate shipments, which is how compressed data center schedules stay supplied without a local branch on every corner.
Do you sell to trade contractors, or only to general contractors?
Both. We supply GCs running the shell and fit-out, and the specialty trades stacked under them: concrete cutters, electrical and mechanical crews, insulation and finish trades, and the commissioning-clean contractors who close the job out. Net-terms accounts are available on request, and every account gets a dedicated rep, not a call-center queue.
What do you stock for pre-commissioning cleanliness protocols?
The white-space discipline stack: ZipWall containment and poly sheeting, walk-off and tacky matting, negative air machines with HEPA filtration, true-HEPA vacuums, and commissioning-grade final-clean chemistry and microfiber. If the project runs a formal cleanliness spec, your rep can map the containment and filtration package to the protocol phases so the gear shows up when each zone flips.
Can you handle temporary humidity control before rack delivery?
Yes. We stock Phoenix and Legend Brands LGR dehumidifiers and desiccant units for slab cure, coatings windows, and holding white-space humidity targets ahead of rack and server delivery. Desiccant is usually the right answer for large-volume, low-grain targets; LGR covers most conditioned interior phases. We size by grains per pound against the space and the target, and rental-versus-purchase economics usually favor purchase on a multi-month fit-out.
A crew is gearing up for its first data center job. Do you offer terms or financing?
Yes. Net 30 terms are available on approved credit, and equipment purchases can be financed through our PEAC Solutions partnership, details and the application are on our financing page at /financing. The typical pattern for a first data center contract is financing the capital equipment, dust extractors, negative air, dehumidification, while running consumables on net terms.
What happens when a live facility takes water?
Call 214.235.0721. The 24/7 CAT line routes to a rep who can open the Grand Prairie warehouse for unscheduled pickup. The water-response stack, extractors, air movers, LGR dehumidifiers, moisture meters, is the inventory we keep deepest, because it is the one category where hours are the whole game. Facilities teams running data centers get the same routing as our restoration CAT customers.
FIELD REPORTS
From this vertical

Construction
The Hazard With No CFR Number Is Already Writing Citations: Heat and the General Duty Clause
OSHA's heat rule stalled. But the Heat NEP was reissued in April 2026 and the General Duty Clause still cites heat. The plan is a supply decision first.

Construction
Table 1 Says Compliant. Your Silica Dust Says Otherwise.
The right diamond blade paired with an undersized HEPA extractor is still an OSHA 1926.1153 exposure. Table 1 is a system spec, not a shopping list, and most crews buy half of it.

Construction
In Date Is Not Anchored: The Fall-Protection Gap That Still Passes the Walk-Through
The harness tag was current. The anchor was rated for the wrong load and the fall-clearance math left the worker hitting the deck before the lanyard locked. Subpart M does not grade on good intentions.
Related
You might also need
Construction
Construction
Concrete cutting and coring, dust-control HEPA vacs, surface protection, fall protection, ladders, hand and power tools, and containment, stocked for GCs and specialty trades across the DFW Metroplex.
Facilities
Facilities Management
Floor machines, HEPA vacuums, industrial brooms and brushes, window and restroom tools, disinfectant chemistry, and facility PPE, for the in-house teams and commercial cleaners keeping DFW buildings operational.










