When the LGR is the right call
- The job has moved past bulk water and the environment is already at moderate humidity, which is exactly where conventional output collapses.
- Bound water in hardwood, plaster, or a low-permeance assembly is what is left, and drying has to continue at low vapor pressure.
- The class of intrusion is 3 or 4, so the evaporation load and the material density both argue for a unit that will not stall.
- The drying goal is aggressive relative to ambient conditions and the schedule leaves no room for a plateau.
